California Utility Builds Solar Microgrid in 27 Days to Avert Wildfires in Sierra Nevadas

A solar microgrid, built in 27 days in cold and windy weather, was Southern California Edison’s (SCE) solution to an urgent need to avert wildfires near a remote dam in the Sierra Nevada mountains. Installing the microgrid in November allowed the utility to turn off a line that provided power to the site of the Gem Dam, part of the Rush … [Read more...]