PepsiCo NA Installing Tesla Megapack Battery Storage to Supply Electric Trucks at California Site

May 22, 2024
The 170,000-square-foot Fresno facility is home to a fleet operation which distributes such products as Pepsi, STARRY, Gatorade, Rockstar, Aquafina and more. The beverage giant is expanding its electric-powered truck fleet across California, and its Frito-Lay brand is exploring microgrids in the state.

PepsiCo Beverages North America is installing two Tesla Megapack battery storage systems to power heavy-duty electric truck charging at its Fresno, California, manufacturing, distribution and depot site.

The 170,000-square-foot Fresno facility is home to a fleet operation which distributes such products as Pepsi, STARRY, Gatorade, Rockstar, Aquafina and more. The beverage giant is expanding its electric-powered truck fleet across California, and its Frito-Lay brand is exploring microgrids in the state.

PepsiCo will soon have 50 Class 8 Tesla Semi trucks based in Fresno, with 75 Ford E-Transit electric vans moving to electrify the equipment services fleet across the state. At Fresno, trucks will be charged by eight 750-kW Tesla chargers and the two Tesla Megapack systems installed on-site.

“Our fleet electrification is an important part of our pep+ (PepsiCo Positive) strategy and illustrates how sustainability is a core business strategy at PepsiCo—good for the planet, good for our business and good for the communities we serve,” John Dean, president for PepsiCo Beverages North America, said in a statement.

Fleet Electrification and the Grid

Learn More at T&D World Live October 1-3 in Atlanta

The PepsiCo electric fleet expansion was supported with a state grant provided by the California Air Resources Board, the San Joaquin Valley Air Pollution Control District, and the California Energy Commission. How is clean vehicle adoption doing among fleets? Read new report.

Tesla, which has a Megapack manufacturing site in California, has deployed its battery storage product to support microgrid and grid balancing projects across the globe.

The concerns over electricity resource adequacy is leading many e-mobility projects to consider microgrid solutions on-site. Earlier this week, developer Scale Microgrids announced a non-binding partnership with EO Charging to support power generation for EV charging sites across the U.S.

ELM Microgrid and other companies also are working to deploy on-site power solutions for expanding EV charging. Electrify America and bus-truck manufacturer NFI recently opened a direct-current fast charging facility in Ontario, California with 7 MW of charging capacity.

About the Author

Microgrid Knowledge Editors

gettyimages1341067688_sdl__1320x755

Revolutionizing Defense: The Crucial Role of Microgrids and Schneider Electric in Department of Defense Energy Resiliency

Sept. 13, 2024
Last month, the North American Electric Reliability Corporation (NERC) said that U.S. power grids are becoming more susceptible to cyberattacks every day, with vulnerable attack...

Download the full report

Five Keys to Effectively Managing the Power Grid with AI

Veritone presents five artificial intelligence-powered solutions that help those in the electric power industry enhance grid resilience, increase the rate of decarbonization, ...